Quality & Compliance

Quality is the starting point of any manufacturing partnership, not an afterthought. For every order we run defined checks from incoming materials through to pre-shipment, so that what leaves our facility matches what was agreed at sample stage.

Certifications & documents

Documentation is prepared for the products supplied and the destination market. Reach out for the declarations relevant to your programme.

CE

Conformity for products placed on the European market, covering safety and electromagnetic requirements.

RoHS

Restriction of hazardous substances compliance for electrical and electronic equipment.

FCC

Electromagnetic compatibility documentation for products shipped to the United States.

Quality control process

Each production run moves through four checkpoints before it is packed and released. The checks below are the ones applied to festival and decorative lighting orders.

  1. Incoming material inspection at the Taili Light facility
    Step 01

    Incoming material inspection

    Materials are verified against the approved specification before they are released to the production line.

    • Wire gauge, insulation and conductor review
    • LED bead and light string sample checks
    • Plugs, connectors and adaptors checked against specification
  2. In-line assembly inspection at the Taili Light facility
    Step 02

    In-line assembly inspection

    Assembly is inspected while it runs, so deviations are corrected during production rather than discovered after packing.

    • Solder points and connection reliability
    • Set length, light spacing and bead count
    • Control modes and synchronisation between sets
  3. Finished-goods testing at the Taili Light facility
    Step 03

    Finished-goods testing

    Completed sets are powered on and reviewed on the test bench before they reach the packing area.

    • Power-on lighting and function check
    • Continuous run observation of lighting sets
    • Low-voltage wiring and connector review
  4. Pre-shipment audit at the Taili Light facility
    Step 04

    Pre-shipment audit

    Packed goods are sampled and compared against the approved order before the containers are loaded.

    • Carton opening and appearance sampling
    • Model, labelling and packaging confirmation
    • Final order checklist review before loading

Testing capability

Our testing approach combines power-on checks, functional review of control modes and connectors, and consistency checks within each order.

Power-on and function testing

Power-on and function testing

Lighting sets are powered up to confirm output, flashing modes and control behaviour before packing.

Connections and safety review

Connections and safety review

Plugs, connectors, low-voltage wiring and sealed construction are reviewed, including outdoor ranges built for exposed installation.

Light output consistency

Light output consistency

Colour and brightness are compared within the same order so the finished batch reads as one consistent set.

Packaging and labelling verification

Packaging and labelling verification

Outer cartons, labels and shipping marks are sampled against the approved order and destination requirements.

Inspection and testing take place at our NO.11 Building facility. Where a market requires specific documentation, we prepare the relevant declarations against the standards applicable to the products supplied.

Planning a programme that needs documentation?

Share your target market and product range and we will outline the checks and declarations that apply.